Friday 25 March 2011

25/3/11

This morning we have been getting ready for the filming in the woods. We have been choosing jewellery for Leanne to wear. Soon we will do her make up, and go film.

25/3/11 part 2

This is the dress Leanne will be wearing for the river scene.

Thursday 24 March 2011

24/3/11 part 4

We have decided that instead of doing the filming in the wood today we will do the filming tomorrow morning.

24/3/11 part 3

Today in the afternoon lesson we are filming the scene in the woods with the flowers and the ring. The problem we are having is finding a ring to use for the scene.

Tomorrow on 25/3/11 Leanne and Amber in the afternoon are going down by the river to film the scene with the love letter and the origami swan.                                  

The part of the river where Leanne and Amber are filming.

24/3/11

Today I will be working with Leanne on the editing of the music video.  Amber is blogging the work we do.

24/3/11 part 2

After a talk with Steve we are going to be doing these things for the music video;

  • Soft edit at the beginning of the video. 
  • More guitar- think of what's going on. 
  • Use mirror shot at beginning.
  • Forest 
  • Eye contact 
  • Abstract 
  • River with swan or boat- Love letter 
  • Forest- 
Shot 1- walking and dropping flowers.
Shot 2- placing of flowers and ring.

Wednesday 23 March 2011

23/3/11 part 2

Today we have redone 3 minutes of the music video. Without any rendering problems.

23/3/11

Today because of the rendering difficulty Leanne and I have started to edit our music video again. As this option would be faster than having to edit than wait for it to stop rendering.  Today I will be helping Leanne edit so we can edit quicker, and hopefully for preciously.

Tuesday 22 March 2011

22/3/11

Today we have been perfecting our blogs adding images and pictures.
Today we have had a problem with editing the music video,  the problem is rendering. Rendering is slowing down our editing which is causing us to believe that this will be a major problem when we complete the music video.

What we have to do to perfect the music video

  • Someone needs to finish the costume designs (Colour in) 
  • Finish editing
  • Perfect blog

Photos from music video

The guitars and amp we were going to use in our video. We ended up only using the amp and the white guitar.
 Leanne doing her hair and make up for the performance in the woods.
 Us setting up the equipment for the scene in the woods. Seen is the drum kit, camera and tripod, the guitar, amp, and Leanne.
Amber doing my make up for the performance.
The drum kit. It didn't take as long as I thought it would because I had set it up before and dismantled it.

Feedback for the video via Facebook

Me and my group created a group on facebook where we put the rough cut music video for people to give us feedback so we can improve the video.

Some of the comments we have had back are:
Good locations
But better performance in the woods.
Works well with the genre.

Hey Monday- Homecoming Redone Music Video Rough cut

Feedback from groups watching music video

What were the strongest parts of the video?

The video had good locations.
Leanne looks appropriately styled.
Handheld shots were effective.
Camera shots.
Lighting.
Editing.

Which bits of the performance need improving?

More angles and cuts in the performance section(performance in the woods).
Guitar. Amber needs to play harder to the music.

How appropriate was the video to the genre of the music? Anything that could be described as unconventional?

The locations fit the genre and the style of the video fits.


I believe that all the feedback can be used to improve the music video. I think that we will work hard to improve the performance in the woods, especially with Amber.

Friday 18 March 2011

18/3/11 part 3

Here is the card we made for Miller's Music Centre to say thank you for their kindness. We created it using Photoshop and card and pens from the classroom

18/3/11

So far today we have started to fill in the information sheets, half way through lip syncing, and have started to make a thank you card to Miller's Music Centre.

18/3/11 todays goals

  1. Lip Sync clips for music video *
  2. Blog work that we have done today and the rest of the project *
  3. Sort out the clips we need for the video *
  4. Fill in information on sheets *
  5. Call Miller's Music to say thank you for the use of the drum kit. *

Thursday 17 March 2011

9/3/11 the filming we did in cambridge

On wednesday the 9th march we went into Cambridge to a garage by the Grafton centre to film a few shots for the music video.
We went to town at lunch time to get filming started early. We used the Grafton toilets  as a costume and make up area,  we went to Poundland and brought speakers which you attach to your mobile to play music louder and clearer. We used the speakers for our performance, they worked tremendously well.
We managed to get a lot of good clips for the video, we had no complications, everything went smoothly.

Wednesday 16 March 2011

16/3/11 - 2

In the afternoon lesson we are editing the music video footage. We have imported the footage from our camera and Leanne and Amber are lip syncing the clips to the music on Final Cut.

16/3/11

Yesterday at 1:05 we brought the drum kit down to the woods from the hall. We spent time setting up outside trying to get the mise-en-scene right. The drum kit was the most difficult to set up but I managed to do it from recalling how I took it apart.
An hour in we had technical difficulty when the i pod speakers ran out of battery, I went and got some batteries which worked for half an hour longer before we resorted to using Ambers phone playing the song. This was harder to hear which made trying to performer to it difficult. When we were filming alot of students came outside by our set up to smoke, which was distracting, especially when three boys came over to the drum, kit and asked to play it. One of the boys then broke a stick in half and attempted to play the drums. We stepped in and stated that the drums were for hire and playing the kit with the sharp sticks would damage the kit. The boys walked away and we were free to get back to work.

Though this scene had its problems I think that we managed to get some really good shots and made the music video look professional and realistic.

Tuesday 15 March 2011

15/3/11

Today we are filming the scene in woods by the college. Currently Leanne is filming a scene at home in her room and will be in soon. We plan to film the scene at lunch time and hope that the weather does not disturb our filming.

I think that the biggest issues we are going to face today are the setting up off the drum kit and the possibility of rain.  I continue to check the weather for today so just in case it rains. The weather for today is misty, this doesn't seem like to much of a problem except for the lighting of the scene.
 I'm trying to think of alternative settings. An alternative setting I have thought of is the main hall, but I would have to ask for permission.

Monday 14 March 2011

Technical Analysis of Video- Foo Fighters 'All My Life'

1) Number of setup changes (change of location/ costume/ performer)

  • three location changes. The car park, corridor, and stage. 
  • there is only one costume for each of the band. 
  • there are four performers. Singer, guitarist, bassist, and drummer. 

2) The different camera angles used in each set up

  • Midshots 
  • close-ups 
  • crane
  • tracking
  • low angle
  • high angle 

3) How the editing works between these elements

  • the editing is fast
  • changing between each edit using out of focus effects. 
  • At the high point of the video they spotlight the different members of the band, with 1 second edits. 
4) What can you learn from this
I can learn that it is good to use quick changes to keep the audiences attention, and use lighting well to bring that extra professional touch.

14/3/11

Today we were meant to filming in the woods by the college, as we couldn't on friday, but due to costume complications we are unable to do any filming. We can't film tomorrow until half way through second lesson, due to performers having appointments.

Friday 11 March 2011

11/3/11

Today we contacted Millers Music Centre asking what time the drums and mic are being delivered. The manager of the store, Barry Robinson, has said that he and his workers are trying to contact the people who are meant to be delivering the drum kit and mic. We are still waiting to hear from them, so we can start filming in the forest.






While we have been waiting we have done our make up for the performance and sorted the costume and hair. We got the rest of our props ready; Two guitars, amp and drum sticks.

Thursday 10 March 2011

9/3/11 Filming in Cambridge

In this picture Leanne is walking down the garage ramp. 
She needed help remembering her lines so I stood out of sight of the 
camera but close enough for her to read them.  



In this scene Leanne is writing the song down as she is singing it. 

This is the garage we filmed a part of the music video. 


This is the camera we used to film. 



This is when I did a tracking shot with Leanne.

10/3/11

Today we called Miller's Music Centre after they left a voicemail saying they were giving us an acoustic drum kit. We have decided that we will use the acoustic drum kit tomorrow for filming in the woods.

We have just heard back from the earlier conversation, and it has been decided that the drum kit will be delivered to the colleges reception hopefully in the morning tomorrow.

10/3/11

Today we called Miller's Music Centre after they left a voicemail saying they were giving us an acoustic drum kit. We have decided that we will use the acoustic drum kit tomorrow for filming in the woods.

Monday 7 March 2011

7/3/11 part 2

Today we have called and talked to Richard Drew of Miller's Music Centre and discussed our arrangement. We are calling back on wednesday to get everything finally sorted.

7/3/11

On friday we contacted Miller's Music Centre in Cambridge, to see if we could use a drum kit and microphone. At the weekend we heard back from them as they sent us emails saying that we could use a digital drum kit and a microphone, if we put an advert at the end of our music video for them.

This is the email they sent to us.

Friday 4 March 2011

Email sent to Music stores

Dear sir/madam 

 I'am inquiring on behalf of Long Road College students to the potential use of a microphone and a drum kit, next week for a few days for our music video. We would be more than happy to add your logo at the end of the music video, as we have no budget. We would be happy to make a deal with you as we haven't been given a budget for props. 
   We would be very grateful for help. 

Yours faithfully 
      Long Road music group, Sophie Swan 

Thursday 3 March 2011

Music Video Schedule

Wednesday 2nd- Timeline-DONE
Pick locations
Create Performers Costume on photoshop
Mind Maps
Blog Update

Thursday 3rd- Take Pictures Of Locations
2 lessons. Sort Extras e.g Props
Blog Update

Friday 4th- Create Other Performers Costumes
2 lessons. Location Setup
Back Up Locations
Sort Out Lights

Monday 7th- Get Cameras, Props, Costumes,
1 lesson. Get Everything Ready To Start Filming

Tuesday 8th- OFF

Wednesday 9th- Am- Filming In Forest
2 lessons. Pm- Filming Off College Sight

Thursday 10th- Filming
2 lessons.

Friday 11th- Filming
2/3 lessons.

Locations: Forest/Woods, Car Park Opposite Grafton, Train station, Town.

Hey Monday- Video Treatment

The treatment is telling the concept of the video  and what will be done in the video.

The concept of this video is a story line and live looking performance. The story is about a girl who has broken up with her boyfriend.   We have decided that the live performance will be done in the woods. We are using sites around Cambridge, such as the train station, for the story telling side.
We start the video off with Leanne walking out of the train station

Wednesday 2 March 2011

2/3/11

Today we made a schedule of everything we have to do in the next two weeks. We have decided about what days we are filming and preparing for filming

Music video director- Chris Cunningham

Chris Cunningham started his career in 1989 with the animatronic show 'Spitting image'. He then went onto work on 'Aliens 3' in 1990 and in 1994 worked on the film version of 'Judge Dredd'.  The last film he worked on was 'A.I', he then left and started work on directing music videos. He appeared on the Channel 4 show 'Mirror ball'.

Tuesday 1 March 2011

1/3/11

Today we made a list of everything we need to do for the music video.  I also made a mind map for props. Which includes images.

To do list for Alternative rock music video

To Do-

Mindmaps.

  • Location 
  • Clothing
  • Props 
  • Lighting
Moodboards.

  • Clothing
  • Props 
Just to do-

  • Shotlist 
  • Storyboard
  • Contact sheet 
  • Timetable 

Preperation